WWW.TSPMA.ORG | 25 Its original architectural design was cutting edge, a visually striking Lamella dome structural design where intersecting arches form a diamond pattern. The original wood members utilized were coastal Douglas Fir beams of various sizes. In 2021, Thompson and Litton was tasked by Kingsport City Schools (KCS) to reroof the existing Dobyns- Bennett school building. As part of this reroofing project, the Buck Van Huss Dome would require a new roof coating to be provided. However, due to previous experience with the dome roof, Thompson and Litton proactively requested to have the existing wood roof structure tested to verify its load carrying capacity. This testing occurred in June 2022, with results provided in August 2022. The results of those tests indicated the wood members at the top of the dome had lost a substantial amount of their load bearing capacity due to the heat continually trapped at the top of the dome structure throughout its 55-year existence. Out of an abundance of caution, KCS then immediately closed the Dome for public use and engaged with Thompson and Litton to develop a plan to address the issue. Given the Buck Van Huss Dome’s —continued on page 26
View this content as a flipbook by clicking here.